Between the signing of the quote and the first meal prepared in a Tyko kitchen, several weeks pass. This timeframe varies depending on the degree of customization of the project, the availability of installers, and the preparation of the site on the client’s side. Measuring these steps helps avoid unpleasant surprises and allows for a calm planning of your kitchen project.
Coordination of trades before the Tyko Kitchen installation
Competitors say little about what happens before the installer arrives. Yet this is where part of the actual delay occurs. The kitchen can only be installed if plumbing, electricity, and connections are completed. A delay in any of these technical areas automatically pushes back the installation date, even if the Tyko furniture is delivered on time.
Read also : Everything You Need to Know About Batiav: A Guide for Individuals Before Signing Up
In practice, the coordination between the plumber, electrician, and kitchen designer relies on the client, unless the contract provides for delegated project management. Check this point as soon as you sign the quote.
- The water supply and drainage must be positioned according to the approved kitchen plan, not according to the old layout.
- The electrical panel must support the combined power of the planned appliances (oven, cooktop, hood, dishwasher).
- The wall and floor coverings must be installed or at least protected before the installation of the base cabinets.
A one-week delay in plumbing can push the kitchen installation back by two to three weeks if the installer’s schedule is already booked with another project. During the summer, intervention slots become scarce, which amplifies the domino effect.
Recommended read : Understanding DHL Delivery Times Between France and Germany: What You Need to Know
Before finalizing your project, you can consult the kitchen tips from Monde Gourmandises to better anticipate these preparatory steps.

Delivery and installation times for Tyko: summary table by project type
The overall timeframe depends on the level of customization. A custom project with specific materials (quartz, ceramic, lacquered finishes) extends the manufacturing phase compared to a standard layout.
| Project Type | Design/Validation Phase | Estimated Manufacturing | On-Site Installation |
|---|---|---|---|
| Standard Kitchen (catalog models) | Few days to one week | Few weeks | One to two days |
| Semi-Custom Kitchen | One to two weeks | Several weeks | Two to three days |
| Fully Custom Kitchen | Two to four weeks (back and forth on plans) | Extended duration depending on materials | Three days or more |
The design phase is often the one that the client compresses the most, thinking it will save time. In reality, quickly validating a plan without checking the measurements on-site generates rework in manufacturing and extends the total delay.
What extends manufacturing without warning
A change in color or material after plan validation resets the clock. Any modification post-validation can add several weeks to the schedule. Some high-end materials (large format ceramic, custom solid wood) have their own supply lead times, independent of the kitchen designer.
Tyko Kitchen After-Sales Service: compliance guarantee and installation defects
The after-sales service is not limited to replacing a faulty hinge. Kitchen disputes mainly concern installation defects or installation issues, not the furniture itself. The distinction between a manufacturing defect and an installation defect determines the applicable recourse.
In case of non-compliance of the delivered items (damaged furniture, incorrect dimensions), the legal compliance guarantee applies. In case of a defect during installation, the guarantee of perfect completion comes into play. The kitchen designer is required to install the kitchen within the contractual timeframe, or failing that, within a maximum period of 30 days from the conclusion of the service contract.
Recourse in case of installation delay
If the contractual deadline is exceeded, the client can formally notify the kitchen designer by registered mail. Without a response or execution within a reasonable time, the resolution of the contract and damages may be requested.
- Keep all written exchanges (emails, letters, SMS) with dates.
- Photograph the state of the site at delivery and after installation.
- Check that the installer has a ten-year insurance policy, mandatory for this type of intervention.
The installer’s ten-year insurance covers damages compromising the solidity or rendering the work unfit for its intended use. Requesting a certificate before the start of work protects the client in case of subsequent claims.

Checks upon receiving a Tyko kitchen
The reception of the site is the moment when the client validates (or refuses) the compliance of the installation. Signing the reception report without raising any reservations significantly reduces the possibilities for later recourse.
Before signing, check the alignment of the fronts, the operation of fully extending drawers, the sealing of water connections, and the proper functioning of each integrated appliance. Any anomaly must be recorded in writing on the reception report, even minor ones.
An aesthetic defect (chip on a countertop, scratch on a front) reported after signing the reception report will be more difficult to have covered. However, a hidden defect that appears several months after installation remains covered by the legal guarantee.
The quality of a Tyko kitchen project is measured as much by the rigor of the preparation as by the final result. A well-coordinated site, with realistic deadlines and timely reservations, remains the best protection against prolonged disputes.